Description
Two-part high-voltage AC test system for testing the voltage resistance. The connection is made via high voltage cables to the test object. The system consists of a separate control unit (control unit) and a power unit. The voltage drop occurs on the power section via a tube which has been shown above. The power unit of the test unit is housed in a mobile metal housing. The housing is equipped with large rubber tires (160 mm). The control unit can be fixed for transport on the power section.
Highlights
– 100kV AC
– PI-regulated
– Test current: 0.5mA – 100mA
– Power: 10000 VA
– With oil transformator
– Testing time: 1s – 99min, endless
– For aplications with fixed high voltage cabling
– Ramping
– Robust burning function
– 4-wire-contact monitoring
– Wire break monitoring
– Launch control
– Programmable test parameters
– RS232, digital I/O (SPS), CAN
– Software, DLL, LabView, Active-X (option)